Concrete Platform Over Existing Floor

You can purchase concrete leveling compounds at home improvement retailers to level out the floor.
Concrete platform over existing floor. Step 2 buff the concrete surface. Ripping up concrete and building a deck seemed like a daunting and expensive task so when we saw newtechwood deck a floor we thought it would be absolutely perfect for our space. These smooth 24 in. How to install a false floor over a basement slab.
A floor buffer is a fast moving high powered machine. A slab with this much damage can t be fixed. Luckily we ve got some great outdoor flooring ideas over concrete starting with building a deck. Over galvanized steel deck can also be specified to obtain the benefit of the corrosion protection of galvanized steel deck with a factory applied prime paint substrate.
Ipe hardwood deck tiles are diy semi permanent or permanent modular tiles from managed sustainable forests. Galvanized asc steel deck offers steel deck products that are galvanized in accordance with astm a653. Installing deck flooring on a cement patio. In this guide we ll provide you with basic instructions to help install a composite deck over concrete.
A sleeper system is a substructure made up of joists that sits on the surface of the concrete below the decking. Allow the cleaned surface to dry. False floors also known as floating floors are not permanently attached to the floor or walls. The overlay material was a total of 1 4 inch thick over an old concrete floor.
Placing the compound on top of the existing concrete will allow you to make repairs to the low points that may cause problems. You can rent a floor buffer from a hardware supply store. We resurfaced the concrete with our overlay stamped a cobblestone pattern into it and pitched the overlay away from the house to shed water. The standard galvanized coating is g60 0 6 ounce per square foot.
We recommend applying param 5500 at a minimum thickness of 3 8 1 2 is preferred to. Use a floor buffer for scuffing away the loosened spots of paint. A moist surface isn t ideal for further cleaning or painting. But it can be covered up and this article will show you how.
My husband harrison and i have wanted to change out our patio floor since the day we bought the house. Within a day our. To install a composite deck over concrete you re going to need a sleeper system. Basements without furnaces or water heaters can.
The installation of calcium aluminate cement based self leveling concrete param 5500 along with expanded metal lath for reinforcement is a successful fast track method to convert a plywood subfloor into a beautiful concrete floor. The results look just like a deck but getting them is much easier and less expensive than building a deck from scratch. Plywood substrate in a kitchen. Set up a sleeper system.
Metal lath stapled over plywood substrate.